| Customization: | Available |
|---|---|
| After-sales Service: | Online Technical Support |
| Warranty: | 3year |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency







20HL Horizontal Tank | |||||
Basic tank specification | Fittings | ||||
Type | Cylinder&Horizontal | PVRV | DN50 | Wenhan | |
Medium | Beer | Sample valve | DN25 | Wenhan | |
Front Side | Domed seal, 1400*4mm | CIP arm | DN32 | Wenhan | |
End side | Domed seal, 1400*4mm | Bunging valve | Pressure range: 0.02-0.22 Mpa | Wenhan | |
Material | SUS304L | Connection: DN32, TC | |||
Effective volume | 24 | HL | Pressure gauge | DN32,Diaphragm type, Range: 0-4/0-6bar | |
Total volume | 29.3 | HL | Temp sensor | 2 pcs,PT100,20cm | PT100 |
Diameter | 1360 | mm | Racking arm | DN50, TC connection Screw connection with tank | |
Lengit | 3400 | mm | Manway-Side | / | |
Cooling area | 3.4 | M2 | Manway-Front | Size: 580*480mm | |
Tank design pressure | 2 | BAR | Support bracket | AISI stainless steel 4 pcs | |
Test pressure | 3.5 | BAR | Optional items | ||
Design temp | -5~40 | °C | Dry hopping port | 4 inch, TC/screw connection | |
Tank Inside | Carbonation unit | DN25 | |||
Material | AISI 304 | Others | Solenoid valves for glycol control | ||
Domed seal | Ra≤0.4 | μm | Insulation | ||
Cylinder | Ra≤0.4 | μm | Insulation | Polyurethane | |
Welding joint | Ra≤0.6 | μm | Density | ≥40 | kg/m³ |
Cone bottom | Non | μm | Thickness | 80 | mm |
Thickness | Non | mm | Support legs | ||
Cone thickness | Non | mm | Quantity | 4 | Pc |
Tank outer cladding | Material | AISI304 | |||
Material | AISI 304, Brushed polishing/2B | Diameter | 133 | mm | |
Thickness | 2 | mm | Thickness | 3 | mm |
Treatment Surface | Polishing | Adjustable leg plate | 159 | mm | |
Cooling jacket | Thickness | 5 | mm | ||
Jackettype | Dimple jacket | Screw length | 100-150 | mm | |
Quantity | 1 | PC | |||
Cylinder jacket | 1 | PC | |||
Conical jacket | Non | PC | |||
Working pressure | 2 | bar | |||
Test pressure | 3 | bar | |||









Content | Remark | |
3 years for main parts | Scope: Mainly for vessels fabricated by ZYB. 3 years guarantee since the final acceptance on site. No leaking, scratch etc Material thickness follow standard in agreements. Equipment design&fabrication fits the local regulations. Free maintaining/replacement of main vessel parts in warranty period | |
2 years for auxiliary equipment | Scope: Support unit from sub contractors, which includes pumps, motors, mill, steam generator, chiller etc. Free maintaining&fitting replacement in case any failure. Technical report from both ZYB and sub contractors. | |
2 years Electrical components | Scope: Control panel&components inside; sensors; flow meter etc. Free maintaining&fitting replacement in case any failure within warranty period. | |
Spare parts | Min spares storage for 2 years operation request, and for easy replacement when needed | |
Lift long service | When the system is beyond warranty, ZYB offers life long service as below: - Online/On site technical support -Regular maintenance as end user's request after acceptance -Expansion support on layout, P&ID and facility design/evaluation -Technical support on utilities combined with ZYB system. | |