| Customization: | Available |
|---|---|
| After-sales Service: | Online Technical Support |
| Warranty: | 1year |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency







20HL-Four vessel-Automatic Brewhouse system | ||||||
Grain handling system | ||||||
Malt Mill | 1200-1500kg/h | 1 set | 2 rollers, SS material Explosion proof motor, IE3 ABB Brand or others OptiOnal: 4 Roller malt mill | |||
Malt Conveyor | 2000-30000kg/h | 1 set | Chain disc type, closed circulation to avoid further milled malt crushing during transpor to MT Driving motor with speed controller visible glass during malt transport | |||
Grist hopper | 1.0-1.5m³ | 1 pc | SS304 steel fabrication Square type/round type Ground mounted or above MT For malt storage between 1-2 brews With auto gate valve Load cells for weight control, combined with automation system | |||
Brewhouse | ||||||
In Genral | Automation: Automatic Designed for average plato of 12P, possible for higher gravity brewing, flexible plato range. Basic configuration: MT+LT+KT+WT Heating method: Steam (electric/natural gas/LPG powered) | |||||
Grist hrdrator | 102/133mm | 1 set | For grain&water mixing while mashing in Visible glass CIP cleaning function Automatic warm water mixing&water amount supply | |||
Mash tun | 20HL | 1 pc | Coned top, fully insulated Bottom stir helps lower the twist force, Optional top stir Paddle type helps with better mash liquid mixing Motor/stir unit with VFD control Cylinder&bottom steam jacket, separately control for possible small batch brewing Steam coil pipe&branch inlet for even steam supply MT used for kettle function when KWT being occupied | |||
Lauter tun | 20HL | 1 pc | Coned top, fully insulated Stir blade for higher efficiency wort extraction Adjustable stir blade (optional) Grain out paddle for automatic grain out & spent grain removing Removable filter plate, filtration area: 13-17% Reasonable wort collection coil and outlets for better extraction Smooth mash liquid transfer | |||
Kettle | 20HL | 1 pc | Cone top&bottom, fully insulated Cylinder&bottom steam jacket, separate control Final evaporation: 8-10% Internal calendar configured. Condensing/energy recovery unit, with coil pipe for water heating Hope dosing container installed on tank top. Bottom pressure sensor for automation process | |||
Whirlpool | 20HL | 1 pc | Cone top&bottom, fully insulated Flat bottom with 1 degree slope for easy draining 2*clear wort outlet at cylinder bottom for highest amount wort collection Bottom pressure sensor for automation process | |||
Heat exchanger | 40HL/H | 1 set | Double stage, with aeration unit 20HL/H for cooling wort down in 30-40min Wort cooling via cold water/glycol Cold water temp: 3 degree, glycol temp: -5 degree. Optional: Single stage heat exchanger while with extra cold water tank configuration. | |||
Tubular heat exchanger (optional) | / | 1 set | A tubular heat exchanger configured, installed from the process of boiling to whirlpool, to cool down the wort from 99-100℃to 80-85℃for the final stage hops additive. With hot water after at 80 degree returning to HLT for new brew using. B15 | |||
Pumps | 3-10m³/h | 3 sets | Centrifugal pump SS304L pump head Motor brand: ABB or others Water cooling,with VFD | |||
Steam condensing unit | / | 1 set | Installed with kettle for evaporation reusing Coil pipe inside for water heating via vapor steam With hot water flowing back to HLT for new brew Water returning temp: 80-85℃ | |||
Wort grant | / | 1 set | Visible glass Vertical typle or horizontal type with sensors for level control and auto lautering process control | |||
Wort sink | / | 1 set | Sample taking and plato test etc Platform installed | |||
Valves | DN50/32 | Assorted | Pneumatic valves, optional proximity switch Connection: TC/DIN etc | |||
Piping | DN50/32 | Assorted | For the whole brewhouse connection | |||
Sensors | / | Assorted | Pressure sensor with vessels for volume detect Empty flow sensors at liquid outlet Foam sensors with KT for steam control | |||
Water station | ||||||
Hot water tank | 40-60HL | 1 pc | Steam heating Insulated&jacketd, or with steamcoil Sized for 2-3 times of brewhouse size, being enlarged based on daily brew batches. For sufficient hot water supply of mashing in&sparging&flushing etc For storage of hot water from wort cooling | |||
Hot water pump | 10m³/h | 1 set | Centrifugal pump SS304L pump head Motor brand: ABB or others Water cooling,with VFD | |||
Piping&valves | / | Assorted | ||||
Control system | ||||||
Main Control panel | 1 set | Stainless steel material IP55 Mechanical switch Emergency button All panels grounded PLC control panel with remote control Fittings: Siemens, Schneuder | ||||
Pneumatic control panel | 1 set | Stainless steel material IP55 For air hose distribution to different paneumatic fittings Installed under BH platform or nearby Combined with main control panel | ||||
Monitor | 1 set | 15" Siemens HMI or Installation: Brewhouse platform or between BH&cellar region | ||||
Software | 1 set | ZYBREW software designed/programmed as exact brewing process request. For basic automation. Optional: SmartBrew/Brewmaxx | ||||









Content | Remark | |
3 years for main parts | Scope: Mainly for vessels fabricated by ZYB. 3 years guarantee since the final acceptance on site. No leaking, scratch etc Material thickness follow standard in agreements. Equipment design&fabrication fits the local regulations. Free maintaining/replacement of main vessel parts in warranty period | |
2 years for auxiliary equipment | Scope: Support unit from sub contractors, which includes pumps, motors, mill, steam generator, chiller etc. Free maintaining&fitting replacement in case any failure. Technical report from both ZYB and sub contractors. | |
2 years Electrical components | Scope: Control panel&components inside; sensors; flow meter etc. Free maintaining&fitting replacement in case any failure within warranty period. | |
Spare parts | Min spares storage for 2 years operation request, and for easy replacement when needed | |
Lift long service | When the system is beyond warranty, ZYB offers life long service as below: - Online/On site technical support -Regular maintenance as end user's request after acceptance -Expansion support on layout, P&ID and facility design/evaluation -Technical support on utilities combined with ZYB system. | |